Delhi rooftop solar incentives & savings (2024–25) – updated guide 2025

Delhi homeowners and businesses have more help than ever to go solar. The central PM Surya Ghar: Muft Bijli Yojana offers a direct cash subsidy for home systems, while Delhi’s Solar Energy Policy adds its own capital rebate, generation-based incentive (GBI) and waived net-metering fees. Stack these with accelerated-depreciation tax breaks for companies and the case for rooftop solar in FY 2025–26 is hard to beat.

🔎 Need personalised numbers? Try our free ROI calculator.

1. PM Surya Ghar subsidy for residential systems

System size Central CFA (₹) Net cost drop
1 kW 30,000 ~35% off capex
2 kW 60,000 ~35% off
3 kW or more 78,000 max ~30% off
  • Payment goes directly to your bank within 60 days of commissioning.
  • Sign up to begin

2. Delhi state incentives (2025)

Incentive Homes ≤3 kW Homes 3–10 kW C&I rooftops
Capital rebate ₹2,000/kW (max ₹10,000) ₹2,000/kW
GBI (first 3 years) ₹3/kWh ₹2/kWh ₹1/kWh
Net-metering fees Waived for ≤10 kW Waived Registration only ₹1,000
Group/virtual net-metering Allowed Allowed Allowed

How it stacks

A 3 kW system saves ₹78,000 (central) + ₹6,000 (Delhi) upfront plus roughly ₹49,000/year in bill + GBI credits.

3. Net-metering waivers & procedure

  1. Stage 1 – Online application, zero feasibility charge for ≤10 kW.
  2. Installation – Upload geo-tagged photos.
  3. Stage 2 – Technical approval issued within 20 days.
  4. Meter change – Free bi-directional meter for ≤10 kW; C&I pay ₹5,500.

Credits roll over 12 months; settlement at average pooled power cost.

4. Tax benefits for businesses

Benefit Details Cash impact
Accelerated depreciation 40% year 1 + 20% extra for assets before Mar 31 Cuts corporate tax ~25% of capex
GST input credit Full ITC on 13.8% composite GST Improves ROI by 5–6%
Net/gross metering Up to 2 MW in Delhi Offset peak tariffs ₹10+/kWh

A 50 kW rooftop can hit pay-back in 3–4 years after tax savings and bill offset.

5. Sample pay-back timelines

Scenario Net cost (₹) Annual benefit (₹) Pay-back
3 kW home 1,26,000 49,000 2.5 yrs
5 kW home 2,59,500 73,000 3.5 yrs
50 kW C&I 24 lakh (post-tax) 8.1 lakh 3 yrs

6. Ready to claim your subsidy?

🚀 Get my subsidy-ready quote


Frequently asked questions

Can I claim both the PM Surya Ghar subsidy and the Delhi top-up?

Yes. CFA is processed via the national portal; Delhi credits the state rebate in your first post-commission bill.

Do tenants qualify for the subsidy?

Only the registered electricity-connection holder can apply. Tenants need a no-objection certificate from the owner and must hold the DISCOM account.

Where does the GBI appear on my bill?

For systems ≤3 kW, Delhi DISCOMs show ₹3/kWh credit as a separate line item each month.

What documents are needed for net-metering?

Aadhaar or PAN, latest electricity bill, property proof, signed single-line diagram and installer safety certificate.

How long does CFA payment take?

MNRE releases funds within 30–90 days after the final inspection report is approved.



Last updated: 28 June 2025
Sources: MNRE CFA guidelines May 2025; Delhi Solar Policy 2023; DERC Order 11/2024; BRPL Solar Portal FAQ June 2025.